Then the engineer turned up on the early part of the visit times ( 8-1) )9:30 he arrived.
Tracked back to exchange, drilled thru and fitted everything.
Clean tidy, hovered up ect.
Made sure BB was on and refused a tip at the end.
100% on that lot.
Been told speeds will vary for a few days, already tested faster than promised ATM 20meg down and 1.2 down.
Thats on copper, soon will have FTC.
100% on that.
Even he said he was suprised how happy I was with the service

Does it get worse?







